​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Pr​ojects under Construction​​​

TAX 2014B  ​BURNS DRIVE RECONSTRUCTION STREET PROJECT
​Burns Street is to be reconstructed in its entirety from Freeport to South Coppell Road and will include new paving and underground utility lines, improved drainage and sidewalks.  Construction is scheduled to start fall 2016 and is anticipated to complete late summer 2017.  This project was awarded to RKM Utility Services in the amount of $989,135.00

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

PROJECTS IN DESIGN

#ST 15-01A  FREEPORT PARKWAY, (BETHEL RD TO I-635)

A design contract for Freeport Parkway improvements was awarded to J. Volk Consulting in December 2015 for a total contract amount of $726,000.  The design will include all work necessary for the reconstruction of the road and a realignment of the existing bridge.  Construction is anticipated to begin in 2017.

If you have questions about the project, please contact Kent Collins, Assistant Director of Engineering at (972)304-7019 or email kcollins@coppelltx.gov​

TAX 2014A  PARKWAY BOULEVARD

A design contract for the Parkway Blvd. improvements was awarded to J. Volk Consultants, Inc. in August 2015.  The project consists of concrete panel replacement, crack repairs, utility upgrades and sidewalk ramp improvements.  The project will also improve drainage.  Construction is anticipated to begin in 2017.

If you have questions about the project, please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

TAX 2014C  TOWN CENTER BOULEVARD RECONSTRUCTION PROJECT
The design for these improvements is currently underway with JQ Infrastructure. The project will impact the portion from the Town Center Shopping Center to north of the intersection of Town Center Drive. The project includes complete pavement reconstruction, utility upgrades and sidewalk infill. Construction is anticipated to begin late 2017.

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

TAX 2015B  PLANTATION DRIVE AND MOSSY OAKS STREET RECONSTRUCTION PROJECT 
The design for these improvements is currently underway with Pape-Dawson Engineers. The project will impact the entire length of Plantation Drive and Mossy Oaks Street. The project includes complete pavement reconstruction and utility upgrades. Construction is anticipated in FY 2018-2019.

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov​​

TAX 2016A  NEIGHBORHOOD ALLEY REPLACEMENT PROJECT #3

A design is under way for the alley replacement project. The project consists of complete alley replacement in the project area. The project will also improve alley drainage. Construction is anticipated to begin in late fall 2017.

If you have any questions or concerns about the project please contact Jamie Brierton, Project Manager at (972)462-5151 or email jbrierton@coppelltx.gov

FUTURE ProjectS

AIRLINE DRIVE
S​ BELT LINE ROAD
CAMBRIA DRIVE